Traffic will be rough this weekend

All WEATHER PERMITTING

This browser does not support the video element.

All construction that is scheduled is as the GA-DOT reports it and is weather-permitting, so all times, locations, and lanes blocked may change. Additional projects may turn up during the weekend as well, so listen for live updates on air and online.

  • I-85/GA-400 Interchange Bridge Work
    • I-85/nb/sb near GA-400
    • up to three lanes blocked
    • 9 p.m. Friday – 5 a.m. Monday
  • Buford-Spring Connector/nb/sb
    • At least one lane blocked in each direction
    • from 7 a.m. – 3 p.m. Saturday ONLY
  • I-285/wb near GA-400
    • Three left lanes blocked
    • 9 p.m. Friday – 5 a.m. Monday
    • Expect delays on I-285 and GA-400 in the area
  • I-285/wb Roswell Rd. to Riverside Dr.
    • left lane blocked
    • 9 p.m. Friday – 5 a.m. Monday
    • Expect delays on I-285 and GA-400 in the area
  • Bridge Painting I-75/85/nb near I-20
    • Up to three lanes blocked
    • each overnight from 9 p.m. – 5 a.m. Friday, Saturday, Sunday
    • Expect delays, especially after the Braves games.
  • I-20/eb near Wesley Chapel Rd.
    • right lane blocked
    • 9 p.m. Friday – 5 a.m. Monday
  • I-285/nb Covington Hwy. to Indian Creek MARTA Station
    • right lane blocked
    • 8:30 a.m. – 5 p.m. Saturday
  • Atlanta: The Braves return to Turner Field to play the St. Louis Cardinals Friday (7:30 p.m.), Saturday (3:05 p.m.), and Sunday (8:05 p.m.).
    • Expect extra traffic in the area, especially when combined with the construction on I-85 north of Brookwood and I-75/85 near I-20.
    • Expect big delays, especially on I-85 before and after the Braves games.
  • BB&T Atlanta Open at Atlantic Station
    • The tournament takes place each day through Sunday (7/28).